Public Safety/Community Education/Main Entry Project: Steel work ongoing at the building site. Pedestrians and Drivers need to follow closure signs and be cautious as they travel around the construction site. Landscaping work ongoing at the main entrance. The main exit will be closed Monday(10/12) and Tuesday(10/13) of next week for concrete and entry sign work.
Campus Fiber Cabling/ New MDF Room Project: Additional testing of the fire alarm backup system may occur Sunday(10/11) and Monday(10/12) mornings at 7am. This scheduling is still being coordinated.
Student Services Project: Construction fencing will be installed on Tuesday(10/13) with saw cutting of the asphalt on Wednesday(10/14) and trenching starting on Thursday(10/15). This work runs from the east side of the Student Center load center due east to the southeast corner of Cosmetology. Pedestrians need to follow closure signs and flagmen when construction traffic begins around that area. This trenching and piping work will continue through the end of November.
Signage Project: Mobilization at the marquee locations at Gothard/Center and McFadden/Goldenwest is scheduled to start this week.
Thank you